Industry, Projects
Twist lock handling system
- Client:BROMMA
- Date: 2016
- Description:
With the help of our specific knowledge and competent team, a fully automated 7-prototype system has been designed to ensure the optimal performance in container handling. It is equipped with a sustainable mounting tube and a high quality hydraulic system.
Duration: 5 months
Input: 120 t of metal
Length of a filter: 25 m
Input: 400 t of metal