Projects, Shipbuilding & Repair
RIVER CRUISER Ship
- Client:De Hoop
- Date: 2019
- Description:
Tourist vessel “River cruiser”. 8 months, 65 workers & lots of tones of steel made this project possible. We have performed all production work from A to Z, so we are familiar with and have thoroughly tested each and every element of NB 492. The ship will operate in Dutch inland waters.
Duration: 8 months
Dimensions: length – 135 m, width – 11,5 m, weight – 181 t.